If you are choosing financing for your first flip, the loan will determine whether the deal makes money or becomes a loss. This post walks through 10 non negotiable facts every first time investor needs to compare the best fix and flip loans for beginners — with clear numbers, timeline sensitivities, fee math, draw mechanics, and the exact questions to ask lenders. Expect checklists, worked examples, and real lender context so you can match financing to your rehab plan and exit strategy.
1. Know the loan types that matter for fix and flip projects
Picking the wrong loan type eats your profit faster than a bad rehab estimate. Match the loan to your exit plan and project scale before you sign anything.
Primary loan types and when to use them
Hard money: Short-term, asset-based loans from private lenders. Use when speed and flexibility matter more than price — single-property flips where you need to close fast. Bridge loans: Slightly longer and often cleaner paperwork than hard money; useful when you need a bridge to refinance or sell but expect a reliable exit within 6–18 months. Construction loans (single-property rehab): Lend against purchase plus hard cost; designed for larger scope rehabs or partial new construction where draws are tied to build milestones. Rehab lines / HELOC-style products: Good for investors running multiple small rehabs or uncertain scopes who want a reusable credit line rather than a closed-term loan. Short-term refinance / cash-out refinance: Best when you intend to hold as a rental after rehab and want to convert to traditional debt post-close.
- Speed vs cost trade-off: Hard money and private lenders (fast funding, higher rates/points) vs banks (slow, cheaper).
- Underwriting focus differs: Some lenders underwrite on ARV and comps; others focus on borrower experience or LTC. Know which matters for your deal.
- Scale matters: For multi-unit or portfolio flips consider bridge or commercial fix and flip lenders rather than single-property hard money.
Concrete example: You find a house with purchase price 150000, ARV 250000 and estimated rehab 70000. A lender that caps at 70 percent ARV would offer up to 175000 — enough to buy and fund some rehab but leaving about 45000 to cover the rest of rehab and closing costs. In practice you'd need partner equity, a larger down payment, or a lender that uses LTC to cover more of the rehab. Level 4 Funding, for example, is a Phoenix-based private lender founded in 2012 that routinely funds fixes quickly and will lend up to 70 percent LTV, which illustrates how speed and LTV caps intersect in real deals.
What beginners commonly misunderstand: Many assume lowest nominal rate is best. That ignores points, origination fees, draw inspection lag, and whether the lender measures by ARV or LTC. A cheap-looking rate with tight ARV caps can force extra equity or a secondary loan that erodes any apparent savings.
Practical lender match-ups — quick guide
- Fast single flip with limited track record: Private hard money (fast close, higher cost).
- Planned conversion to rental after rehab: Short-term refinance or portfolio bridge that permits later refinance into conventional debt.
- Multiple small rehabs or unknown scope: Rehab line or HELOC-style product to avoid repeated origination fees.
- Larger or multi-unit projects: Construction or commercial fix and flip lenders that handle draws and compliance.
Action checklist: Match your exit (sale vs refinance), document the timeline, list three lenders by product type (include at least one local/private and one national), and get a sample loan estimate showing LTV/LTC caps and draw rules before you bid on the deal. For deeper reading on product details see Fix and Flip Loans: Complete Investor's Guide & Tips.

Takeaway: Choose loan type by exit and timeline first — only then optimize for rate and fees. Next consideration: calculate ARV, LTV and LTC to see whether the loan will actually cover your rehab without killing margins.
2. Master ARV, LTV, and LTC and how they determine your maximum loan
Start with the math: lenders set the maximum loan by applying a percentage to either the property value after repairs or the total project cost, and then they use the lower of those results. This is not a negotiation gimmick. It is how lenders control loss severity if the rehab goes wrong or the market moves.
How lenders use ARV, LTV, and LTC
ARV (after repair value) is the expected resale price after the work is complete. LTV (loan to value) is loan divided by that value. LTC (loan to cost) is loan divided by purchase price plus rehab cost. Lenders will quote a max percentage of ARV or LTC, and then fund at the lower of the two limits. Practical consequence: if your rehab is heavy, LTC will often be the binding constraint even when ARV looks generous.
Practical limitation and tradeoff: conservative lenders or first time investors often see ARV caps of 65 percent while repeat borrowers can reach 70 to 75 percent. Higher ARV caps sound good, but they also require stronger comps and often a paid appraisal. If you pick a lender without checking which metric they actually apply you will run into a funding gap at closing.
Concrete example and real world application
Concrete Example: Purchase price 150000, estimated ARV 250000, estimated rehab 80000. At 70 percent ARV the theoretical loan is 175000. At 75 percent LTC the theoretical loan is 172500 (75% of 230000 total cost). The lender will fund the lower amount, 172500, leaving you to cover the 57500 gap. If rehab overruns by 10000 the LTC drops and your gap grows. If the appraisal comes in at 240000 instead of 250000 the ARV cap falls and funding can shrink further.
Real use case: A first time investor in Phoenix ran these numbers and assumed 70 percent ARV would cover purchase plus rehab. The lender instead applied a 70 percent LTC cap because the rehab scope was high. That forced the investor to find a partner to cover the gap. The deal still worked, but required more equity and delayed closing.
- Checklist before you submit an LOI: obtain two recent comparable sales to justify ARV
- Budget check: build a line item rehab spreadsheet and add a 10 percent overrun contingency
- Gap plan: calculate loan shortfall under both ARV and LTC caps and confirm how you will cover it—cash, partner equity, seller carry, or smaller scope
Next consideration: run your deal twice: once with the lender quoted ARV percent and once with their LTC percent. Ask the lender in writing which cap they will enforce and whether points or origination fees are taken from proceeds or added to your gap. Do not assume the higher of the two will apply.
3. Calculate all in borrowing cost: interest rate, points, and carrying costs
Key point: the headline interest rate is only one piece of cost — points, fees, inspections, taxes, insurance, and time on market can change your effective financing cost dramatically and flip a projected profit into a loss.
How to build an all‑in financing number
Step 1 – List every lender charge and carrying expense. Include annual interest, origination points, underwriting/appraisal fees, inspection/draw fees, extension fees, prepaid interest, property taxes, insurance, utilities, and a modest holding contingency for longer market times.
Step 2 – Convert one‑time fees into time‑adjusted cost. Add the one‑time fees and divide by the loan amount, then divide again by the fraction of year you expect to hold the loan to get an annualized effect. That turns points and origination fees into an apples‑to‑apples annual rate you can compare to the nominal interest rate.
Concrete example: understand how timeline changes the effective rate
Concrete Example: assume a 175000 loan (70 percent of a 250000 ARV), headline rate 10 percent interest only, and 2 points origination (3500). Add underwriting/appraisal 1000, draw/inspection total 600, and carrying taxes/insurance/utilities 200 per month. Run two exit scenarios: sell at 6 months and sell at 12 months.
| Item | 6 months cost | 12 months cost |
|---|---|---|
| Interest (10% pa) | 8750 | 17500 |
| Points (2% one‑time) | 3500 | 3500 |
| Underwriting/appraisal | 1000 | 1000 |
| Draw/inspection fees | 600 | 1200 |
| Taxes/insurance/utilities | 1200 | 2400 |
| Total financing cost | 15050 | 25600 |
| Effective annualized cost (Total / Loan) | 8.60% for 6 months (≈17.2% annualized) | 14.63% pa |
What this shows: short holds magnify the impact of one‑time fees. Points that look small at closing become a very large annual percentage when the flip is short. Many beginners see a 10 percent rate and assume their financing cost is 10 percent — it rarely is.
Trade‑off to evaluate: interest‑only structures lower monthly cashflow pressure vs amortizing loans, which reduce total interest if you hold beyond the flip window. For most 6‑ to 12‑month flips an interest‑only hard money loan keeps cashflow predictable; if your exit might stretch past a year, negotiate amortization or a step‑down to avoid a surprise payment cliff.
- Practical insight: always calculate an effective financing rate that includes one‑time fees amortized over your expected hold period rather than relying on nominal APR alone.
- Ask lenders for a fully itemized loan estimate showing points, fees, inspection charges, extension penalties, and sample draw fees so you can plug the line items into your spreadsheet.
- Stress test two timelines — best case (60–90 days after rehab) and a stretched case (6–12 months). Use the stretched case to set your contingency and price target.
Real‑world use case: a Phoenix investor underbid a house on the assumption of a 9 percent hard money loan. After closing they discovered 3 points, high draw inspection fees, and two months of delayed draws during permitting. The effective cost for the 8‑month hold moved from an assumed 9 percent to closer to 18 percent, wiping out the projected margin. Asking for a full sample loan estimate and confirming draw turnaround with the lender before committing would have prevented the mistake.
Next actions: get an itemized loan estimate from each potential lender, run effective cost for both 6‑ and 12‑month holds, and compare those numbers to other financing options including low‑interest bridge lenders or a cash out refinance on a future property. For a practical lender example and speed-to‑fund context see Fix and Flip Loans: Complete Investor's Guide & Tips and the hard money primer on Investopedia.
4. Align loan term and exit strategy so financing does not become the bottleneck
Loan term mismatch is the single easiest way to erase projected profit. If your loan runs out before the house is sellable or refinancable you will either pay steep extension costs, borrow more at worse terms, or accept a fire-sale price.
Practical consequence: short-term fix and flip loans (commonly 6 to 12 months) minimize carrying interest but leave almost no margin for delay. Longer bridge or construction loans reduce extension risk but usually increase points, underwriting friction, and sometimes interest.
Concrete example: You borrow $175,000 on an interest-only hard money loan at 10 percent intending a 6-month retail flip. Monthly interest is about $1,458. If the market adds three months to your timeline you face roughly $4,375 in extra interest plus an extension fee (assume 1 percent = $1,750). That unplanned $6,125 cuts straight into profit and can flip a marginal deal to a loss.
Exit types and which loan terms actually fit
Retail resale: best with 6 to 12 month fix and flip loans when comps are reliable. Refinance-to-rental: requires a lender willing to underwrite refinance path and allows for conventional seasoning (often 6–12 months). Wholesale or assignment: needs the fastest funding and the shortest term because you close quickly and exit immediately.
Judgment: Beginners should not assume a sale happens on schedule. Model a worst-case timeline + at least 30 percent and pick a loan that either covers that buffer or has clear, affordable extension terms. Treat generous extension language as a feature, not a nuisance fee.
- Ask before you sign: exact loan term, extension fees, maximum total extensions, and per-extension cost.
- Verify refinance compatibility: if you plan to convert to a rental, confirm seasoning, appraisal, and occupancy requirements with a conventional lender or a portfolio lender ahead of closing.
- Model sensitivity: run your spreadsheet for sale at planned month, planned + 30 percent, and planned + 100 percent to see how interest and fees change profit.
If a lender cannot provide a written extension policy or a sample estimate of extension costs, treat that as a red flag.
Real-world note: Local private lenders that fund quickly and understand local resale timelines are often more flexible on extensions and practical exit paths than national platforms. See Fix and Flip Loans: Complete Investor's Guide & Tips for how quick funding and draw flexibility work in practice.
Next consideration: before you lock a loan, run a timeline stress test, secure written extension terms, and confirm your planned exit will clear any refinance seasoning or occupancy requirements — otherwise financing turns from an enabler into the bottleneck you did not budget for.
5. Understand draw schedules, inspections, and how money is released
Straight to the point: how and when a lender releases rehab money is one of the single biggest timing risks that eats profit on flips. A clean approval is only half the work — slow draws, missing paperwork, or failed inspections turn planned cashflow into unplanned carrying costs.
How staged draws typically work
Basic structure: most private fix and flip lenders do an initial disbursement to cover purchase (or purchase plus a small mobilization for rehab) and then pay the remainder in staged draws tied to completed milestones. Common stages are demo, rough mechanics, drywall, finishes, and final completion — but lenders label stages differently.
What lenders require to release funds: invoices, contractor lien waivers, photo evidence, and usually an inspection report. Some lenders accept digital photos and contractor affidavits; others require third-party inspectors or an in-house review — that difference matters for speed and cost.
Practical trade-offs that matter to first-time flippers
Speed versus control: lenders that release funds faster tend to rely on trusted contractors, clear invoicing, and borrower experience. Lenders that are conservative hold larger retainages and require third-party inspections. Faster draws reduce carrying interest but increase borrower operational demands and documentation burden.
Cost of inspection delays: if an inspection adds 7 to 10 business days to a draw, that delay multiplies interest and holding costs. For a $80,000 rehab outstanding at 10 percent annual interest, each 10-day delay costs roughly $220 in interest alone — and that is before soft-cost knock-on effects like postponed contractor schedules or permit time.
A common hidden requirement: lenders often require licensed contractors, permits pulled in borrower name or company, and lien waivers at each draw. If you planned to use a subcontractor without licenses or informal cash payments, expect holdbacks or refused draws.
Concrete example
Concrete Example: you close on a house for $150,000 with a $70,000 rehab. Lender funds purchase and an initial mobilization of $10,000. Draw schedule: demo (20 percent of rehab), rough/mechs (40 percent), finishes (30 percent), final (10 percent). If the rough/mechs draw is delayed 14 days while waiting for an inspector, your outstanding balance stays higher and you pay roughly $257 extra in interest on that $56,000 portion at a 11 percent APR — plus contractors may stop work while waiting for payment.
- Checklist before you sign: demand a written draw schedule with milestone definitions and typical inspection turnaround time.
- Document requirement check: confirm whether the lender needs third-party inspection, contractor license, photos, and lien waivers at each draw.
- Buffer your schedule: budget 7 to 14 days between draw approval and receipt of funds for conservative planning.
Judgment you won't get from a rate sheet: a lower headline interest rate is worthless if draws are slow or subject to arbitrary holdbacks. For beginners, prioritize predictable, documented draw rules and reliable inspection partners over the smallest point reduction.
Next consideration: before you commit to a lender, call two recent borrowers and ask for their average draw turnaround and a sample draw checklist — if the lender hesitates, treat that as a red flag.
6. Build a realistic rehab budget including contingency and soft costs
Concrete truth: underestimating rehab costs destroys thin flip profits faster than any interest rate. Build a line-item budget that separates hard costs, soft costs, and a realistic contingency before you pick a loan—lenders will underwrite to the budget you present, so whatever you put in the spreadsheet becomes a constraint on funding.
Budget components that matter to lenders and your P&L
Hard costs: demolition, structural repairs, HVAC/plumbing/electrical, roofing, windows, insulation, drywall, flooring, kitchens and baths, exterior work. These are the items a lender expects a contractor bid to cover. Soft costs: permits, plan fees, utility turn-ons, builder risk insurance, property taxes during hold, staging, sales commission, closing costs. Don’t treat soft costs as negligible—they typically run 8 to 12 percent of the hard costs on a modest rehab.
Contingency rule of thumb: 10 percent for light cosmetic jobs, 15 percent for typical flips, 20 percent or more for older homes with deferred maintenance or unknown structural issues. Be honest: first-time investors should budget toward the high end until they build a contractor network and track real outcomes.
| Line item | Amount |
|---|---|
| Demolition + debris | $5,000 |
| Structural/roof/major systems | $25,000 |
| Kitchens and baths | $30,000 |
| Interior finishes and paint | $15,000 |
| Exterior and landscaping | $5,000 |
| Soft costs (permits, utilities, taxes, insurance) | $7,000 |
| Subtotal (hard + soft) | $87,000 |
| Contingency (13%) | $11,310 |
| Total projected rehab | $98,310 |
Concrete example: on a project with a $100,000 earmarked rehab, break down and justify each line item with contractor quotes. If you budget 13 percent contingency you arrive at roughly $98,300 total; if an unplanned structural issue pops up and you exceed contingency, you either inject cash or stop work—both erode returns and complicate lender draws.
- What lenders will check: they typically want line-item bids for major scopes and may accept a contingency but often exclude it from the initial draw unless invoices support it.
- Allowance risk: using vague allowances (for example $10,000 for kitchen) is a red flag; lenders and appraisers prefer detailed estimates tied to contractor bids.
- Timing trade-off: a conservative budget with a larger contingency protects you but increases required capital or reduces borrower leverage; an aggressive budget improves projected ROI but raises the probability of cash calls or missed milestones.
Practical insight: lenders fund the work you can document. Keep contractor contracts, permits, and change orders organized. Contingency is insurance, not a flexible spending account—expect to justify its use.

7. Know lender underwriting criteria and required documentation
Key point: lenders underwrite based on three things – property collateral and comps, the rehab plan, and borrower capacity. If you want the best fix and flip loans for beginners you must present clean evidence for each or expect higher rates, greater cash equity, or slower funding.
What lenders actually ask for
- Property packet: purchase contract, MLS sheet or listing, recent photos, and title commitment or preliminary title report
- ARV support: two to four comparable sales, neighborhood market notes, and a short narrative showing how your scope creates that ARV
- Rehab package: line item rehab budget, contractor bids, contractor license and insurance proof, and a draw schedule
- Funds and capacity: proof of funds or earnest money, bank statements, business or personal tax returns, and credit score information
- Entity and closing docs: operating agreement or articles of organization if the purchase is in an LLC and a completed loan application
- Property concerns: disclosure of environmental issues, structural problems, open permits, or code violations that change underwriting or require escrowed repairs
Practical tradeoff: some lenders are collateral first and will fund primarily on comps and ARV with minimal borrower paperwork. Others underwrite the team – experienced flippers and licensed contractors – and will relax pricing when you bring a track record. First-time investors rarely get the best of both worlds. Expect to compensate with larger down payment or higher points if you lack experience or licensed contractors.
Concrete example
Concrete Example: a first-time investor in Phoenix had a 150000 purchase with a 60000 rehab. The lender required a licensed contractor bid, two comps supporting a 260000 ARV, and proof of 20000 in reserves. Because the investor submitted only informal estimates and no contractor license the lender reduced the allowable LTC and required 30000 additional equity. That one missing document increased the investor cash need and nearly killed the deal.
Documentation speed matters. Lenders that fund quickly still will not skip core items. A lender like Level 4 Funding that often funds within 24 hours will still require a rehab budget, contractor insurance, and comps before wiring. Faster funding helps win offers but only when your packet is complete.
Ask each lender for a written underwriting checklist before you submit an LOI – do not rely on verbal assurances.
Judgment that matters: lenders see the same documents every day. Submission order and clarity change outcomes. A sloppy rehab budget or unclear contractor scope creates conservative reserves and higher fees. First-time investors should invest time in packaging clean comps and contractor contracts – that reduces cost more effectively than trying to negotiate a lower headline rate.
Next step – prepare the packet and email it to lenders before placing offers. If a lender will not give a checklist up front, treat that as a red flag and move on. For deeper detail on typical private hard money requirements see Fix and Flip Loans: Complete Investor's Guide & Tips or lender overviews like Investopedia.
8. Compare non interest fees and costs that drive total project economics
Non-interest fees can sink a flip faster than a higher headline rate. For short hold projects the up-front and transactional charges matter more than the nominal APR because they do not amortize over time. Treat every fee as part of your borrowing line item and annualize it against likely hold time before you pick a lender.
Where fees hide and which ones actually matter
Common lender fees: origination points, underwriting or processing fee, appraisal or market analysis fee, broker fee, draw inspection fee (per draw), funding or wire fee, extension fee, prepayment or exit penalty, document prep/title fees, and reconveyance or release fees. Some lenders also require escrows for taxes and insurance or add trustee/service fees that keep recurring costs higher than the advertised rate.
| Fee | Typical cost (for a $175,000 loan) |
|---|---|
| Origination / points (1 – 4%) | $1,750 – $7,000 |
| Underwriting / processing | $500 – $1,500 |
| Appraisal / market analysis | $100 – $500 |
| Broker fee (0 – 2%) | $0 – $3,500 |
| Draw inspection (per draw) | $75 – $250 |
| Wire / funding / closing | $50 – $300 |
| Extension fee (per extension) | $500 – $1,500 or 0.5 – 1% monthly |
| Prepayment penalty | Often 0 – 1% if present |
Practical insight: If your flip will close and resell inside 90 days, high upfront points are a disproportionately large drag. For projects that often stretch beyond 6 months, a slightly higher monthly interest but lower upfront fees can be cheaper. Always run both scenarios against your realistic hold-time distribution, not the optimistic best case.
Worked example: fees on a $175,000 short-term loan
Concrete example: Assume a $175,000 loan for a 6-month flip. Origination 2% = $3,500; underwriting $1,000; appraisal $400; 4 draw inspections at $150 = $600; wire/closing $200. Total non-interest lender fees = $5,700 (3.26% of loan).
Judgment you need to make: Focus on the all-in cost for your probable hold time, not on the lowest appearing number. Lenders that advertise low rates but bury multiple per-draw and extension fees are often worse for first-time flippers who run into delays. Ask for a full, itemized loan estimate and run sensitivity to 3, 6, and 12 month holds.
- Ask for a single-sheet, itemized loan estimate that shows every fee and the number of draws expected.
- Run an annualized-fee calculation like the info box for 3/6/12 month outcomes and add it to your profit model.
- Check extension and inspection policies – confirm per-draw caps, expected inspection turnaround, and exact extension costs before signing.
Red flag: a lender that refuses to put fees in writing or lists a vague other fee greater than 1% of loan. If they will not commit to an itemized estimate, walk away or demand it in the loan contract. For deeper reading on lender choices and timelines see Fix and Flip Loans: Complete Investor's Guide & Tips and a practical primer on hard money fees at Investopedia.
Takeaway: Negotiate transparency first, then price. The lowest headline rate rarely wins a flip; the lowest verified all-in cost for your expected hold time does.
9. Evaluate lender service, communication, and default remedies
Key point: Lender responsiveness and clear default rules change the economics of a flip more than a fraction of a percent in rate. Slow draws, poor communication, or punitive default clauses will eat profit and can turn a profitable project into a loss long before interest totals do.
What to verify about service and communication
- Draw turnaround time: average hours or days between request and wire; ask for data and recent examples
- Inspection scheduling: who books inspections, how quickly inspectors visit, and whether third party inspectors are used
- Single point of contact: identify servicing rep, emergency contact, and escalation path if a draw or title issue arises
- Loan servicing changes: whether the loan will be sold or transferred and how transfers are handled
- Reporting and statements: frequency of statements, online portal access, and how draw approvals are documented
Practical tradeoff: Fast funding and same day draws cost more up front but reduce carrying costs and lost-deal risk. A cheaper lender with slow processes can add weeks to your timeline and hundreds or thousands in carrying costs, which is a silent tax many beginners miss.
Concrete example: A Phoenix investor needed funds to close on an off-market deal within 48 hours. A local private lender that funds in 24 hours allowed the investor to buy, start demo, and hit first draw milestones that week. That speed cost an extra point up front but preserved an expected 10 percent ROI that would have evaporated if the deal fell through or carrying time extended.
Default remedies you must understand before signing
Distinguish monetary defaults from technical defaults. Monetary default is failure to pay interest or fees. Technical default can be a missed draw inspection, missed insurance coverage, or an unauthorized subcontractor. Lenders often grant little or no cure time for technical defaults – learn the triggers and cure periods.
| Clause to check | Why it matters |
|---|---|
| Cure period length | Short cure periods – 5 to 10 days – give you little room for paperwork or inspection delays |
| Default interest and fees | Default interest can double your carrying cost and accelerate collections |
| Acceleration clause and right to foreclose | Shows how quickly the lender can demand full payment and start foreclosure |
| Power to appoint a receiver or take possession | Receiver appointment can strip control of rehab from borrower and add legal costs |
Judgment from experience: Many first time investors assume default is the worst case and that lenders will work with them. That is optimistic. Lenders that sell loans or use aggressive servicers can move faster on remedies than the originator promised. Get the cure timelines in writing and prefer lenders who document escalation steps instead of immediate acceleration.
- Ask for a sample loan agreement and servicing addendum – read cure period, acceleration, and default interest clauses before signing
- Call two recent borrowers and ask specifically about draw turnaround and how a missed milestone was handled – references reveal how policy works in practice
- Get average draw approval times and inspector scheduling windows in writing – include them in the term sheet where possible
- Confirm servicing contacts and escalation procedures and verify whether the loan will be sold – transfers change responsiveness
For more on working with a fast private lender that funds quickly in Phoenix and the paperwork to expect see Fix and Flip Loans: Complete Investor's Guide & Tips. For background on hard money lender behavior see Investopedia hard money loan overview.
Next consideration: insist on service level details and default cure timelines before you commit funds. If a lender will not provide clear answers or references, treat that as a material red flag and move on.
10. How to choose the right private hard money lender with Level 4 Funding as a factual example
Key point: Selecting a lender is a risk allocation decision – you trade price for speed, local market accuracy, and operational reliability. For first time flippers the wrong trade reduces profit more than a marginally higher rate.
What matters most: funding speed, maximum LTV or LTC, draw cadence and inspection turn time, transparency of fees, and whether the lender understands ARV in your submarket. Give extra weight to operational items when projects are time sensitive.
Lender selection scorecard
How to use the scorecard: Score each lender 1 to 5 on each row, weight the categories based on your deal – for example fund speed 30 percent for competitive purchases, LTV 25 percent if you are cash constrained, draw policy 20 percent, fees 15 percent, references 10 percent.
| Criteria | Level 4 Funding (example) | Kiavi LendingHome (example) | Lima One Capital (example) |
|---|---|---|---|
| Typical funding speed | 24 hours when paperwork is complete | 72 hours to one week | One to two weeks |
| Max LTV on flips | Up to 70 percent LTV | Up to 75 percent ARV on selected products | Typically 70 percent LTC |
| Typical interest / points | Market hard money range; expect higher points for faster funding | Competitive rates for repeat borrowers, digital process | Rates higher for construction style products |
| Draw policy and inspections | Staged draws with local inspections – built to move quickly in Phoenix area | Digital draw management with network inspectors | Structured draw schedule; may require more documentation |
| Operational tradeoff | Very fast local funding – cost for speed can be higher | Faster underwriting for borrowers who fit digital profile | More conservative underwriting, steadier but slower |
Practical insight: Speed matters, but not always. If you need to close a purchase quickly to win a rehab, prioritize a lender that consistently funds within 24 to 72 hours even if rate and points are above market. If you have time and need lower total cost, allow two week plus timelines and shop rates.
Concrete example: A first time investor in Phoenix needs to close on a $150,000 distressed buy with ARV of $240,000 and 12 month rehab. Using Level 4 Funding as an option that can fund within 24 hours at up to 70 percent LTV reduces the required immediate equity and avoids losing the contract. The tradeoff will be higher carrying cost compared with slower, lower rate offers.
- Score lenders: Compare at least three lenders using the weighted scorecard and plug the scores into your deal model.
- Request documents: Ask for a written loan estimate, sample loan agreement, draw schedule, and two borrower references before verbal commitment.
- Test responsiveness: Send a funding question and a draw request simulation to measure actual turn times.
Judgment: For beginners, operational reliability beats tiny rate savings. A lender that delays draws or misprices ARV will erode profit faster than paying an extra point for predictable funding.
Next consideration: After scoring, verify the lender in market by calling recent borrowers and confirming the lender will accept your exit strategy – sale or refinance. That check prevents unpleasant surprises during the critical draw and resale stages.